Veja Mate OWF Jumper Cable Installation

Seaway Offshore Cables – Veja Mate OWF (jumper cable installation) – September 2018 – 73 Array Subsea Cable 

Correll Services was contracted to Seaway Offshore Cables (SOC) to provide two HV jointer/tester, performing the following activities: 

  • Engineering support 
  • Provision of HV tooling and test equipment 
  • 12 x sets of HV terminations on the jumper cable 
  • Conduct a 5kV Insulation Resistance test post installation 
  • Complete and issue ITP documentation to the client 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]