9th September 2025

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing
Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable

SPIE Wind Connect has been awarded a contract to execute the termination and testing of the Inter-Array Cables (IACs) for TPC Phase II, located approximately 20 kilometres offshore from Changhua County, Taiwan. The IACs connect 31 Vestas V174-9.5MW Wind Turbine Generators (WTGs) to the offshore substation.

Summary of works includes:

  • Pre-project coordination and planning meetings
  • Pre-engineering
  • Mobilisation of PPE, specialist tools, and equipment
  • Site inductions, HIRA workshops, familiarisation training days, Fibre Optic Mock up
  • Offshore works:
    • Asset mobilisation and preparation
    • Pre–term testing
    • Stripping, routing & cleating of HV and FO cables within the jackets.
    • Permanent hang off installation
    • Installation of Nexans JB’s & Temperature Sensors
    • Termination of HV cores – Nexans 66Kv
    • Installation of dropper cabling from GIS to Nexans JB
    • Splicing and patching FO cables into local FO termination boxes
  • Post-installation testing including VLF, Lira and Impedance
  • Mechanical Completion Documentation

This project further strengthens SPIE Wind Connects track record in the Asia-Pacific offshore wind market and reinforces its role in enabling the global energy transition.

For further information: Contact Us

More Projects from SPIE Wind Connect

Siemens - Framework Agreement (APAC)

Siemens – High Voltage Management (HV-M) Framework Agreement – December 2025 to Present – HV Services including Electrical Management Systems – APAC This framework agreement demands engineers who are not […]

Baltyk II & III OWF

Seaway 7 – Baltyk II and Baltyk III OWF – February 2026 to Present – Termination & Testing of 66kV inter-array cables (Poland) SPIE Wind Connect, has been awarded a […]

Dogger Bank C OWF

Deme – Dogger Bank C OWF – November 2025 to Present – Termination & Testing of 66kV inter-array cables Under this agreement, SPIE Wind Connect will carry out 66kV inter-array […]

Stylish curve

UVDB Logo BMA Trade Logo