11th November 2024

Moray West OWF

Seaway 7 – Moray West OWF – March to October 2024 – Termination & Testing of 66kV inter-array cables

The Correll Group, Electrical Engineering Division (CEE) was awarded a contract from Seaway 7 to complete the 66kV inter-array cable termination on Moray West Offshore Wind Farm.

Moray West Offshore Wind Farm comprises 60 Wind Turbine Generators and 2 Offshore Substation Platforms (OSPs). Correll Group will be responsible for completing the terminations into the switchgear, installing the Pfisterer size 4 on the OSPs, and the termination and testing of the Fibre Optic cables.

Schedule of works:

  • Pre-project meetings
  • Weekly meetings
  • Site visits
  • Mock-up Trials
  • Pre Project training
  • Mobilisation of PPE, tools & test equipment via 20ft containers.
  • Pre & Post Lay Testing (continuity, insulation resistance, Time Domain Reflectometry and Optical Time Domain Reflectometry)
  • DAC testing (Damped AC testing)
  • On the offshore assets:
    • Tower mobilisation and preparation
    • Stripping the array cables to expose HV cores and fibre optical cable
    • Complete the permanent hang-off
    • Route the HV and FO cables into the GBS
    • Route the HV and FO cable into the OSP
    • Cleat the HV cores from the hang off to the Connex Joints on OSP
    • Cleat the HV cores from the hang off to the SGRE switchgear
    • Terminate and splice the FO cable into the termination box
    • Terminate Pfisterer size 4 power cores into the Connex Joints on OSP
    • Complete post installation string testing on the WTG asset (OTDR) DAC testing
    • Deliver all “As Built” documentation. (IAuditor)
    • Moray West 66kv 60 towers (NKT terms 270 completed) 2 OSP’s Pfisterer size 4 (42 terminations completed) Pre term testing and post term testing including IR,TDR,OTDR and DAC Testing
    • Complete terminations of interconnector cable between OPS’s.

For further information: Contact Us

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo