Global Offshore – Race Bank OWF Cable Repair – August 2020 to December – 2 Array Subsea Cable 

Global Offshore approached CS to support them with HV and FO services associated with the Race Bank cable repair/replacement project.  We were responsible for the Termination & Testing of the IAG cables between Wind Turbine Generators, including: 

  • Mobilising 20 Technicians and 2 Offshore Installation Manager 
  • Pre-project meetings 
  • Procurement of High Voltage and Fibre Optical materials  
  • Site visits 
  • Creations of RAMS 
  • Creation of quality documentation 
  • Project HIRA meetings 
  • Load-out Testing 
  • Post Lay Testing (continuity, insulation resistance, Time Domain Reflectometry and Optical Time Domain Reflectometry). 
  • On the offshore assets: 
    • Cutting of existing array cables ready for extraction 
    • Stripping the array cables to expose the HV cores and FO cable 
    • Complete the permanent hang off 
    • Route the HV and FO cable into the OSS/WTGS 
    • Cleat the HV cores from the hang off to the GIS  
    • Terminate and splice the FO cable into the cabinet 
    • Terminate power cores into the GIS 
    • Deliver an Inspection and Test Plan for the installed and tested system, forming part of key payment milestone. 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo