16th March 2021

Inner Hebridean Islands

Briggs Marine – Inner Hebridean Islands, Scotland – January 2020 to March 2020 – 1 Subsea to Land Cable 

CS contracted with Briggs Marine to complete cable jointing and testing works on the subsea cables and land cables between islands The works include: 

  • Fabrication of project RAM’s 
  • Conducting project meetings 
  • Post load out testing,  
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry (unidirectional) 
    • Setup of Fibre Optical monitoring system within the carousel 
  • Post Lay Testing 
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry  
  • HV/FO Jointing subsea cables to onshore land cables 
  • Very Low Frequency testing 
  • Completion of ITP documentation for issue to the client 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo