16th March 2021

Various Inter Island Export Cables

Briggs Marine – Various Inter Island Export Cables around Scotland & Transformer Inspections – May 2019 to August 2019 

Correll Services was contracted to Briggs Marine to complete cable jointing and testing works on the subsea cables between island’s in and around the Scottish Western Isles.  The works included: 

  • Fabrication of project RAM’s 
  • Conducting project meetings 
  • VLF Testing 
  • Post load out testing,  
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry (Unidirectional) 
    • Setup of Fibre Optical monitoring system within the carousel 
  • Post Lay Testing 
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry  
  • FO Jointing subsea cables to onshore land cables 
  • Transformer Inspections 
  • Completion of ITP documentation for issue to the client 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo