16th March 2021

Borkum Riffgrund 01 OWF

Jan De Nul – Cable Replacement on Borkum Riffgrund 01 OWF – June 2019 to August 2019 – 2 Array Subsea Cables 

CS was contracted to Jan De Nul for the HV & FO termination & testing works associated with the removal and replacement of 2off faulty subsea cables.  WE were responsible for the Termination & Testing of the PCC cables between the Offshore Substation and Wind Turbine Generators, including: 

  • Mobilising 16 Technicians and 1 Offshore Installation Manager 
  • Pre-project meetings 
  • Procurement of High Voltage and Fibre Optical materials  
  • Site visits 
  • Creations of RAMS 
  • Creation of quality documentation 
  • Project HIRA meetings 
  • Load out Testing 
  • Post Lay Testing (continuity, insulation resistance, Time Domain Reflectometry and Optical Time Domain Reflectometry). 
  • On the OSS & WTG’s offshore assets: 
    • Assisting SAP’s to create a Safe System of Work 
    • Cutting of existing array cables ready for extraction 
    • Stripping the array cables to expose the HV cores and FO cable 
    • Complete the permanent hangoff 
    • Route the HV and FO cable into the OSS/WTGS 
    • Cleat the HV cores from the hang off to the GIS  
    • Terminate and splice the FO cable into the cabinet 
    • Terminate three power cores into the GIS 
    • Complete post installation testing from the onshore substation to the floating asset (IR, TDR & OTDR) 
    • Deliver an Inspection and Test Plan for the installed and tested system, forming part of key payment milestone. 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo