Global Marine Systems – Shetland Islands – February 2019 to September 2019 – 3 Subsea to Land Cables 

Correll Services was contracted by Global Marine Systems to complete cable jointing and testing works on the subsea and land cables between island’s in Shetland.  The works included: 

  • Fabrication of project RAM’s 
  • Conducting project meetings 
  • Post load out testing,  
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry (unidirectional) 
    • Setup of Fibre Optical monitoring system within the carousel 
  • Post Lay Testing 
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry  
  • HV/FO Jointing subsea cables to onshore land cables 
  • Through Joints on the land cables 
  • Pole terminations 
  • Very Low Frequency testing 
  • Completion of ITP documentation for issue to the client 

During back-filling activities, the civil contractor damaged a land cable, CS subsequently performed fault-finding procedures to successfully locate the damaged position, using the following items: 

  • Bridge tester (HVB10) 
  • Surge Tester (Thumper) 

More Projects from SPIE Wind Connect

TPC Phase II

Taiwan Power Company (TPC) Phase II Offshore Windfarm – August 2025 to Ongoing Scope: Termination & Testing of 31 66Kv Inter-Array Cables (IACs) and 1 Export Cable SPIE Wind Connect […]

Hollandse Kust West VI OWF

Van Oord – Hollandse Kust West VI OWF – Main Campaign April 2026 – Termination & Testing of 66kV inter- cables – 52 WTGs, 1 OSS SPIE Wind Connect has […]

Windanker OWF

Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS SPIE Wind Connect was awarded […]

Stylish curve

UVDB Logo BMA Trade Logo