Cable Installation (Pull In)

Dedicated to delivering cost-effective, scalable, and sustainable
solutions tailored to meet long-term customer requirements.

Project Experience

Cable Pull In Offshore

Subsea cable installation in offshore wind farms refers to the process of laying and connecting electrical and communication cables beneath the seabed to link offshore wind turbines to each other and to the onshore power grid.

SPIE Wind Connect specialises in the delivery of engineered cable pull-in solutions and comprehensive turnkey packages that encompass cable pull-in, termination, and testing (T&T) services for both export and inter-array cable systems within the offshore wind industry.

Our expertise covers the full lifecycle of cable installation, allowing us to design, fabricate, and execute tailored cable pull-in systems to suit a wide range of offshore foundation types. Whether deploying high-voltage export cables or inter-array cables, our team ensures safe, efficient, and repeatable pull-in operations aligned with project specifications and industry standards.

CABLE PULL IN – ONSHORE

Underground onshore cable installation is a critical phase in connecting offshore wind-generated power to the onshore grid, involving the precise placement and protection of high-voltage export cables beneath the ground surface.

SPIE Wind Connect has extensive expertise in the execution of underground onshore cable installation scopes, encompassing end-to-end project delivery including engineered beach pull operations, civil works and trenching, messenger line deployment for cable routing, and precision transition joint bay installations—all executed in compliance with industry standards and site-specific technical specifications standards.

Supporting Services

In addition to our core capabilities, we offer a comprehensive range of supporting services designed to enhance operational performance, maintain asset integrity, and ensure safe, compliant project delivery across all stages of offshore wind development.

Our support solutions are delivered by highly skilled, industry-accredited teams and can be provided as part of an integrated package or tailored to meet specific project needs. Whether during construction, commissioning, or maintenance phases, we help our clients reduce downtime, ensure safety, and maintain efficiency in challenging
offshore environments.

Services Include:
  • Secondary Works and Low Voltage (LV) Inspections:
  • Walkdowns and Transition Piece Reporting
  • Bolt Replacement and Structural Integrity Packages
  • Confined Space Entry and Rescue Services
  • Guano Cleaning and Maintenance
  • Consultancy and Client Representation

Our end-to-end approach ensures seamless execution across all phases of subsea cable installation, from initial interface coordination to final commissioning.

More Solutions from SPIE Wind Connect

HV Control Room

HV Control Room SPIE Wind Connect operates a dedicated 24/7 High Voltage (HV) Control Room, serving as the central hub…

HV Commissioning

HV Commissioning Commissioning is a critical phase in the construction lifecycle of a High Voltage (HV) Network, serving as the…

Operations & Maintenance

Operations & Maintenance A well-maintained electrical network is essential for delivering reliable and efficient power while ensuring safety for both…

Cable Fault Location & Repair

Fault Location Maintaining the reliability of electrical power and communications systems depends heavily on the ability to quickly identify and…

Cable Termination and Jointing

Cable Jointing Cable jointing involves connecting lengths of power cables to ensure a continuous and reliable electrical path. Because this…

Cable Installation (Pull In)

Cable Pull In Offshore Subsea cable installation in offshore wind farms refers to the process of laying and connecting electrical…

Stylish curve

UVDB Logo BMA Trade Logo