Global Marine Systems – Shetland Islands – February 2019 to September 2019 – 3 Subsea to Land Cables 

Correll Services was contracted by Global Marine Systems to complete cable jointing and testing works on the subsea and land cables between island’s in Shetland.  The works included: 

  • Fabrication of project RAM’s 
  • Conducting project meetings 
  • Post load out testing,  
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry (unidirectional) 
    • Setup of Fibre Optical monitoring system within the carousel 
  • Post Lay Testing 
    • Time Domain Reflectometry (open & closed) 
    • Optical Time Domain Reflectometry  
  • HV/FO Jointing subsea cables to onshore land cables 
  • Through Joints on the land cables 
  • Pole terminations 
  • Very Low Frequency testing 
  • Completion of ITP documentation for issue to the client 

During back-filling activities, the civil contractor damaged a land cable, CS subsequently performed fault-finding procedures to successfully locate the damaged position, using the following items: 

  • Bridge tester (HVB10) 
  • Surge Tester (Thumper) 

More Projects from SPIE Wind Connect

Siemens - Framework Agreement (APAC)

Siemens – High Voltage Management (HV-M) Framework Agreement – December 2025 to Present – HV Services including Electrical Management Systems – APAC This framework agreement demands engineers who are not […]

Baltyk II & III OWF

Seaway 7 – Baltyk II and Baltyk III OWF – February 2026 to Present – Termination & Testing of 66kV inter-array cables (Poland) SPIE Wind Connect, has been awarded a […]

Dogger Bank C OWF

Deme – Dogger Bank C OWF – November 2025 to Present – Termination & Testing of 66kV inter-array cables Under this agreement, SPIE Wind Connect will carry out 66kV inter-array […]

Stylish curve

UVDB Logo BMA Trade Logo