5th July 2024

GE Grid – Saint Nazaire, Fecamp, Courseulles OWF’s

GE Grid – Saint Nazaire, Fecamp, Courseulles OWF’s – December 2023 to January 2024

SPIE Industries carried out the Oil Sampling on the main transformers at 33kV/225kV 280MVA on Saint Nazaire, Fecamp and Courseulles OWF’s for GE Grid.

Oil treatment was subcontracted to a partner, however the SPIE team was heavily involved in the complete operation to assisted their partner.

SPIE also conducted Oil Sampling on the Hitachi Transformers ABB – 0.2MVA – 33/0.84/0.4kV, which were stored as spare parts for the HAL-150 E-stack.

SPIE Industries was responsible for the following activities: 

  • Preparation for activities
  • RAMS (special care for leakage and waste management)
  • Digital reports preparation for inspection with tablets or phones : aim is to be more efficient and produce instantaneous reports,
  • Waterproof check
  • Global visual inspection ( painting, cleanliness)
  • Protection TR Check : Buchholz, oil level
  • Control & check of valve positioning
  • Dryer Check the and silica gel replacement
  • Electrical test:
    • Insulation resistance under 5dVdc:
    • PH Primary/earth
    • Primary PH/ Secondary PH
    • Primary PH / Tertiary PH
    • Secondary PH/earth
    • Tertiary/earth pH
    • Primary/Secondary transformation ratio on the 5 positions of the CPH.T.
  • Oil sampling and analysis in the laboratory:
    • Dielectric strength
    • Water content
    • DGA.
  • Oil refuelling with new oil type MIDEL 7131:
    • Ground circuit check
    • Overall cleaning
    • Applying a revision tag.
  • Withdrawal from the construction site:
    • Site cleaning
    • Reception breakpoint in the presence of the customer
    • Site closure
    • Return of Work Orders.
  • Submission of final reports within 3 weeks:
    • Photo folder
    • Intervention report.

For further information: Contact Us

Request Information Flyer

Fill out your details below and the document will be emailed to you directly.

Project Enquiry
Name
Name
First Name
Last Name
Please contact me at your earliest convenience

More Projects from SPIE Wind Connect

Siemens - Framework Agreement (APAC)

Siemens – High Voltage Management (HV-M) Framework Agreement – December 2025 to Present – HV Services including Electrical Management Systems – APAC This framework agreement demands engineers who are not […]

Baltyk II & III OWF

Seaway 7 – Baltyk II and Baltyk III OWF – February 2026 to Present – Termination & Testing of 66kV inter-array cables (Poland) SPIE Wind Connect, has been awarded a […]

Dogger Bank C OWF

Deme – Dogger Bank C OWF – November 2025 to Present – Termination & Testing of 66kV inter-array cables Under this agreement, SPIE Wind Connect will carry out 66kV inter-array […]

Stylish curve

UVDB Logo BMA Trade Logo