Race Bank Cable Repair

CWind – Race Bank Cable Repair – November 2019 – 1 Array Subsea Cable 

Correll Services was engaged by CWind to complete a HV cable repair on one of the Wind Turbine Generators on the Race Bank OWF.  We mobilised onto the project with 3 x HV & FO technicians and completed the following: 

  • Assistance with project specific engineering 
  • Assistance with containment design 
  • Procurement of materials 
  • Mobilisation of Correll Services plant and machinery 
  • Engineering onsite 
  • Jointing of Raychem Through joint on 1 x phase 
  • Installation of containment 
  • Termination TE T-Connection on GIS 
  • Post Installation testing 

More Projects from SPIE Wind Connect

Siemens - Framework Agreement (APAC)

Siemens – High Voltage Management (HV-M) Framework Agreement – December 2025 to Present – HV Services including Electrical Management Systems – APAC This framework agreement demands engineers who are not […]

Baltyk II & III OWF

Seaway 7 – Baltyk II and Baltyk III OWF – February 2026 to Present – Termination & Testing of 66kV inter-array cables (Poland) SPIE Wind Connect, has been awarded a […]

Dogger Bank C OWF

Deme – Dogger Bank C OWF – November 2025 to Present – Termination & Testing of 66kV inter-array cables Under this agreement, SPIE Wind Connect will carry out 66kV inter-array […]

Stylish curve

UVDB Logo BMA Trade Logo