BACK TO NEWS

24th October 2022

Correll Group awarded contract for Arcadis Ost 1 Offshore Wind Farm

The Correll Group, Electrical Engineering Division have been successful in securing a contract from the Global Marine Group for the post installation integrity testing of all 27 inter-array cables on the Arcadis Ost 1 offshore wind farm.

Arcadis Ost 1 is located in the Baltic Sea, 19 km northeast of the island of Rügen in Germany. Spanning an area of 29 km² and consisting of 27 Vestas V 174 – 9.5 MW wind turbines, Arcadis Ost 1 will have the capacity of 257 MW when fully operational, producing enough green energy to power up to 290,000 households.

Scheduled for completion early 2023, the project will be using state-of-the-art construction methods for the installation of some of the world’s largest wind turbines.

Sam Dowey, Managing Director at Correll, commented;“We are extremely proud to have been awarded this contract from the Global Marine Group and to be working on this project.

Arcadis Ost 1 will be the first offshore wind farm to deploy a floating vessel for the installation of the wind turbine generators  – a significant innovation and a major step forward for the offshore wind industry.”

More News from SPIE Wind Connect

At WindEnergy Hamburg 2026, SPIE and Wirescan joinforces to strengthen cable diagnostics and field services

Cergy, 24th September 2026 – SPIE Global Services Energy, a subsidiary of SPIE – the independent European leader in multi-technical services in the areas of energy and communications – announces […]

Meet SPIE Wind Connect at WindEnergy Hamburg 2026

SPIE Wind Connect, a leading high-voltage engineering specialist serving the offshore wind sector, will be exhibiting at WindEnergy Hamburg 2026, taking place at Hamburg Messe from 22–25 September 2026. As one of […]

We’re exhibiting at Global Offshore Wind 2026

SPIE Wind Connect, a leading high-voltage engineering specialist serving the offshore wind sector, will be exhibiting at Global Offshore Wind 2026, taking place at Manchester Central on 16–17 June 2026. […]

Stylish curve

UVDB Logo BMA Trade Logo