Van Oord – Windanker OWF – Main Campaign Jan 2026 – Termination & Testing of 66kV inter- cables – 21 WTGs, 5 Strings, 1 OSS

SPIE Wind Connect was awarded a contract to provide personnel and equipment to perform offshore terminations & testing of the Electrical Array Cables (EAC) on the Windanker Offshore Windfarm project as follows:

Campaign 1: T&T in Transition Pieces (TPs)16 locations

  • Schedule: Q4 2025 – Q1 2026

Campaign 2: T&T in Offshore Substation (OSS) and T&T in Transition Pieces (TPs)5 locations

  • Schedule: Q1 – Q2 2026

SPIE Wind Connects’ responsibilities:

  • Pre-termination testing of IACs (by Subcontractor) after pulling and stripping (by others);
  • Routing and dressing (fire protection, cleats…) of cable from hang-off to termination point including adjustments on CMS (together with VO riggers);
  • Single core cable (power core) termination;
  • Final connection;
  • Fitting of identification labels;
  • Preparation of cable ends for testing;
  • SAT: VLF + PD + Tangent Delta
  • After testing activities.
  • Mock-up trials.